North West News

PEEL RIVER TO RUN DRY AS TEMPORARY WEIR IS BUILT

The Peel River will soon stop flowing after a new weir was launched in Dungowan today.

It’s first phase of critical drought infrastructure set to extend Tamworth’s water supply to 2021.

text will be replaced

Related Articles

Back to top button