North West News

PEEL RIVER TO RUN DRY AS TEMPORARY WEIR IS BUILT

The Peel River will soon stop flowing after a new weir was launched in Dungowan today.

It’s first phase of critical drought infrastructure set to extend Tamworth’s water supply to 2021.

PEEL RIVER TO RUN DRY AS TEMPORARY WEIR IS BUILT
0 seconds of 0 secondsVolume 90%
Press shift question mark to access a list of keyboard shortcuts
00:00
00:00
00:00
 

Related Articles

Back to top button